A sound handover separates visual inspection, functional testing, documents, incomplete work and follow-up. Each defect should have a location, evidence, owner, deadline and verification status.

What to check

Use this list as a starting point. The depth of review should still match the project stage, decision value, documents and risks.

  1. Inspect finishes room by room under suitable lighting.
  2. Function-test electrical, plumbing, AC, pumps, drainage, doors, locks and equipment.
  3. Review water-sensitive areas such as roofs, bathrooms, balconies, pools and landscape.
  4. Collect final drawings, manuals, warranties, test results, material lists and vendor contacts.
  5. Verify rectification on site before closing a defect.

Questions before deciding

A useful answer should be traceable to documents, site conditions, a responsible party or a clearly stated assumption boundary.

  • What is the acceptance criterion for each system?
  • Who closes each defect and who verifies it?
  • Which documents are required before final payment?

How to document the outcome

Record information sources, review dates, documents read, people interviewed, inaccessible conditions, key findings, decisions, owners and follow-up deadlines. Separate facts, third-party statements, assumptions and recommendations.

For legal, structural, geotechnical, tax, permitting, land, design or specialist-testing decisions, use appropriately authorised and qualified professionals.

Information boundary

This article is general educational guidance. Project, contract, land, building and legal conditions vary and may require a specific review.